Full Construction | Tennis Court​

Tennis Full Constructions. Built for Accuracy and Endurance.

From site preparation and structural concrete to professional surfacing, precise tennis striping, and net-post installation, we manage every stage of the build. Each court is designed for reliable bounce, proper traction, and long-term performance, with fencing, lighting, custom colors, and logos available based on the project.

How We Build Tennis Courts

full-court-construction-tennis-4

1. Tennis Layout & Base Preparation

Every tennis full construction project starts with careful planning and groundwork. We evaluate the location, dimensions, elevations, access, drainage, slope, and placement of net posts, fencing, and lighting before construction begins.

What We Handle

  • Site walk and tennis layout
  • Groundwork and excavation
  • Subgrade preparation
  • Grading, slope, and drainage planning
  • Road-base installation and compaction

Why It Matters

A properly prepared base provides stable support, improves drainage, and helps reduce future movement—creating the foundation for reliable bounce and long-term performance.

Premium Surface Solutions - Court Builder - Post Tension - 3

2. Concrete Slab & Net-Post Foundations

Once the base is prepared, we set the forms, verify the final elevations, slope, and layout, and install the required structural supports. Depending on site conditions and performance goals, the slab may use post-tension or rebar-reinforced concrete.

What We Handle

  • Forms and final-grade checks
  • Post-tension or rebar reinforcement
  • Net-post footers and embedded hardware
  • Light and fence-post footers, when included
  • Concrete placement and professional finishing

Why It Matters

The concrete slab determines the playing surface’s flatness, strength, and crack control. Precise construction and correctly placed net-post hardware support accurate setup and consistent performance.

full-court-construction-tennis-5

3. Tennis Surfacing, Striping & Final Installation

After the concrete has properly cured, we prepare the surface and apply a sport-grade acrylic coating. We finish the playing area with accurate tennis striping, net installation, and any selected custom or multi-sport features.

What We Handle

  • Surface preparation
  • Sport-grade acrylic surfacing
  • Optional CushionX cushioned system
  • Accurate singles and doubles striping
  • Tennis net and post installation
  • Custom colors, logos, fencing, and lighting when selected

Why It Matters

Professional surfacing provides a smooth, even finish, reliable traction, and UV-stable color. Precise lines and proper net placement create the accuracy, bounce, and durability expected from a finished tennis court.

How We Build Tennis Courts

full-court-construction-tennis-4

1. Tennis Layout & Base Preparation

Every tennis full construction project starts with careful planning and groundwork. We evaluate the location, dimensions, elevations, access, drainage, slope, and placement of net posts, fencing, and lighting before construction begins.

What We Handle

  • Site walk and tennis layout
  • Groundwork and excavation
  • Subgrade preparation
  • Grading, slope, and drainage planning
  • Road-base installation and compaction

Why It Matters

A properly prepared base provides stable support, improves drainage, and helps reduce future movement—creating the foundation for reliable bounce and long-term performance.

Premium Surface Solutions - Court Builder - Post Tension - 3

2. Concrete Slab & Net-Post Foundations

Once the base is prepared, we set the forms, verify the final elevations, slope, and layout, and install the required structural supports. Depending on site conditions and performance goals, the slab may use post-tension or rebar-reinforced concrete.

What We Handle

  • Forms and final-grade checks
  • Post-tension or rebar reinforcement
  • Net-post footers and embedded hardware
  • Light and fence-post footers, when included
  • Concrete placement and professional finishing

Why It Matters

The concrete slab determines the playing surface’s flatness, strength, and crack control. Precise construction and correctly placed net-post hardware support accurate setup and consistent performance.

full-court-construction-tennis-5

3. Tennis Surfacing, Striping & Final Installation

After the concrete has properly cured, we prepare the surface and apply a sport-grade acrylic coating. We finish the playing area with accurate tennis striping, net installation, and any selected custom or multi-sport features.

What We Handle

  • Surface preparation
  • Sport-grade acrylic surfacing
  • Optional CushionX cushioned system
  • Accurate singles and doubles striping
  • Tennis net and post installation
  • Custom colors, logos, fencing, and lighting when selected

Why It Matters

Professional surfacing provides a smooth, even finish, reliable traction, and UV-stable color. Precise lines and proper net placement create the accuracy, bounce, and durability expected from a finished tennis court.

How We Build Tennis Courts

full-court-construction-tennis-3

1. Tennis Layout & Base Preparation

Every tennis full construction project starts with careful planning and groundwork. We evaluate the location, dimensions, elevations, access, drainage, slope, and placement of net posts, fencing, and lighting before construction begins.

What We Handle

  • Site walk and tennis layout
  • Groundwork and excavation
  • Subgrade preparation
  • Grading, slope, and drainage planning
  • Road-base installation and compaction

Why It Matters

A properly prepared base provides stable support, improves drainage, and helps reduce future movement—creating the foundation for reliable bounce and long-term performance.

Premium Surface Solutions - Court Builder - Post Tension - 3

2. Concrete Slab & Net-Post Foundations

Once the base is prepared, we set the forms, verify the final elevations, slope, and layout, and install the required structural supports. Depending on site conditions and performance goals, the slab may use post-tension or rebar-reinforced concrete.

What We Handle

  • Forms and final-grade checks
  • Post-tension or rebar reinforcement
  • Net-post footers and embedded hardware
  • Light and fence-post footers, when included
  • Concrete placement and professional finishing

Why It Matters

The concrete slab determines the playing surface’s flatness, strength, and crack control. Precise construction and correctly placed net-post hardware support accurate setup and consistent performance.

3. Tennis Surfacing, Striping & Final Installation

After the concrete has properly cured, we prepare the surface and apply a sport-grade acrylic coating. We finish the playing area with accurate tennis striping, net installation, and any selected custom or multi-sport features.

What We Handle

  • Surface preparation
  • Sport-grade acrylic surfacing
  • Optional CushionX cushioned system
  • Accurate singles and doubles striping
  • Tennis net and post installation
  • Custom colors, logos, fencing, and lighting when selected

Why It Matters

Professional surfacing provides a smooth, even finish, reliable traction, and UV-stable color. Precise lines and proper net placement create the accuracy, bounce, and durability expected from a finished tennis court.

From Site Preparation to a Ready-to-Play Tennis Court

Every high-performing tennis court starts with the right foundation. Our full construction process combines proper site preparation, a stable concrete slab, professional acrylic surfacing, precise tennis striping, and net installation to create a durable court built for reliable bounce, proper traction, and consistent play.

full-court-construction-tennis-6

01 Before

full-court-construction-tennis-7

02 Construction

full-court-construction-tennis-8

03 After

From the initial site walk to the finished playing surface, we plan each stage around the location, court dimensions, elevations, drainage, intended use, and net-post placement. Every detail is completed with precision and care, delivering a ready-to-play tennis court designed for accuracy, endurance, and long-term performance.

Frequently Asked Questions

📍What is included in full tennis court construction?

✅ Full construction includes site preparation, base construction, structural concrete, professional acrylic surfacing, precise court striping, and net-post installation. Fencing, lighting, cushioning, custom colors, and logos may also be included based on the project.

✅ Full construction is best for a new tennis court or when an existing court has significant base, drainage, structural, or leveling problems. Resurfacing is appropriate when the concrete remains sound and only the playing surface requires repair or renewal.

✅ Both systems are available. The right option depends on site conditions, court size, performance goals, and budget. Post-tension concrete may be recommended when greater flatness and crack control are priorities.

✅ Most full tennis court construction projects take several weeks. The exact timeline depends on site conditions, court size, selected features, and weather.

✅ Yes. Tennis courts can be customized with selected surface colors, line configurations, logos, net systems, cushioning, fencing, and lighting.

See Our Tennis Full Constructions

Explore our completed tennis court projects for private residences, HOAs, schools, parks, and sports facilities. Each project combines proper site preparation, durable concrete construction, professional acrylic surfacing, precise court striping, and net installation—delivering consistent bounce, reliable traction, and long-term performance.

Planning a tennis court?

We make the process clear from the start.

We evaluate your site, intended use, drainage, and goals—then recommend the construction approach that makes sense for your project.

Free consultations. Clear recommendations. No guesswork.

Scroll to Top